UPS Systems & Battery Testing
To ensure that your UPS system is working correctly at all times it is important to have regular battery checks performed. At BCL Power our engineers are trained to perform routine battery maintenance including conductance, impedance and discharge testing.
Protection Planning.
You’ll still need to swap every battery eventually, but through regular tests you can ensure your UPS will function when you most need it, protecting you from unnecessary costs.
The Full Solution.
In addition to our standard battery testing, we also provide battery load bank testing. Load bank testing provides information on a battery’s autonomy and how your UPS batteries will perform under load without the risk to your critical equipment.